Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Hybrid cable layer for TOYO Construction

Monday, December 11 2023

General – Heavy Lift

TOYO Construction contracted VARD for one hybrid cable lay and construction vessel.

Vard is contracted for the design and construction.

The vessel will be of VARD 9 15 design, a design especially developed for the need of the customer to cater for the growing Japanese offshore windfarm market, as well as to operate worldwide.

It will have an optimal hull design to suit the natural and construction conditions in Japan, allowing it to be used in both shallow waters and deep waters for floating offshore wind power generation and DC power transmission projects.

VARD`s high technology subsidiary Vard Electro is also involved in the project through deliveries of SeaQ equipment and solutions, including SeaQ Power with energy storage systems, switchboards, and shore connection. When it comes to communication, Vard Electro is delivering the network, entertainment – and communication systems on board.

No related posts.

Filed Under: Cable installation, cable installation vessel

All rights reserved - 2025 cookies