Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Offshore pedestal crane for Aker Solutions

Monday, November 27 2023

Wind Energy – Norfolk Vanguard West

Lifting specialist KenzFigee announced the signing of a contract with Aker Solutions for the supply of an offshore pedestal crane destined for the Norfolk Vanguard West offshore wind farm developed by Vattenfall.

The delivery involves an electric hydraulic box boom offshore Ram Luffing 2400 type with a SWL of 20t, designed and manufactured by KenzFigee for installation on the Norfolk Vanguard HVDC (High-Voltage, Direct Current) converter station situated off the coast of Norfolk, UK.

The expected delivery of the Ram Luffing offshore crane is scheduled for the third quarter in 2024.

Related posts:

  1. Pedestal crane for East Anglia Three HVDC converter station
  2. Rosebank FPSO contract for Aker Solutions
  3. Aker Solutions awarded first SWIFT contract by Equinor
  4. Aker Solutions wins decommissioning order

Filed Under: Aker Solutions, International News, pedestal crane Tagged With: Aker Solutions, KenzFigee, Norfolk Vanguard West, Pedestal crane

All rights reserved - 2025 cookies