Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

UTV670 completed cable burial installation campaign

Wednesday, October 25 2023

Wind Energy – Burial Installation Campaign

Pharos Offshore Group announced that its surface fed trenching vehicle UTV670 has completed her most recent cable burial installation campaign on a European Offshore Windfarm.

UTV670 successfully buried 5 replacement inter array cables to the client’s specified burial requirements whilst facing challenging weather.

This season, UTV670 has worked on a variety of projects covering power cable infrastructure, an O&G umbilical and inter array cables.

The vehicle has been operating with x2 570hp diesel driven surface water pumps, providing an unmatched capability for its size of over 1100hp of water power.

Related posts:

  1. Green light for cable installation Kriegers Flak
  2. Boskalis awarded contracts for Baltica 2 OWF
  3. Jan de Nul orders XL cable-laying vessel Fleeming Jenkin
  4. Van Oord starts cable installation at Baltic Eagle offshore wind farm

Filed Under: Cable installation, International News, Pharos, Trenching Tagged With: cable installation, Pharos

All rights reserved - 2025 cookies