General – Converting PSVs
Fugro is securing long-term capacity in the global offshore renewable energy market by converting the Fugro Resilience and the Topaz Endurance, two platform supply vessels (PSVs), to geotechnical vessels.
Ulstein Design & Solutions AS has been contracted to redesign the two vessels. On 22 September 2023, Ulstein Verft was contracted to convert the Fugro Resilience.
Both vessels were built in 2015. By retrofitting these vessels to geotechnical vessels, Fugro can unlock their versatile potential and adapt them to the specific requirements of the offshore wind sector.