Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Installation inter-array cables Nyuzen OWF

Wednesday, June 28 2023

Wind Energy – Japan

Nippon Salvage successfully installed inter-array cables at the Nyuzen wind farm in Japan using the Masakuni lay barge.

The Masakuni, equipped with an inter-array cable lay system designed and manufactured by Royal IHC, is the first of its kind in Japan.

The system includes a basket carousel, loading arm, lay tensioner, chutes, and quadrant deployment system, making it a remarkable feat of engineering.

Related posts:

  1. ClassNK issues AiP for conversion plan medium-sized SEP vessel
  2. Orion successfully installs Fécamp offshore substation jacket and topside
  3. Shimizu jack-up vessel soon ready for installation in APAC region
  4. Blue Wind prepares for first installation work

Filed Under: Installation, installation vessel, inter-array cables, International News, Japan


Read Magazine Online



Wind and Fossil Info



Event List


  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies