Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

First installation project for Les Alizes

Friday, June 23 2023

Wind Energy – First Project Les Alizes

DHSS – Clarksons Port Services reported that the Les Alizes arrived at the port of Eemshaven in Holland to kick off and load the first monopiles, to be installed at OWF Godewind 3 and Borkum Riffgrund 3.

Photo: Eemshavenonline.

Jan De Nul’s brand-new Heavy Lift Vessel Les Alizés will soon arrive on site and install the first monopile foundation offshore, simultaneously the baptism of fire for this brand-new vessel.

A total of 106 turbine foundations are to be installed.

The aviation team of DHSS – Clarksons Port Services will provide helicopter services during crew changes for platform JB117 and adhoc for the installation vessel.

Related posts:

  1. Jan De Nul starts work on Gode Wind 3 and Borkum Riffgrund 3
  2. Jan de Nul installs 80 turbines in French OWF ahead of schedule
  3. Van Oord installs first monopile at Baltic Eagle offshore wind farm
  4. Export cables for Baltyk II & III

Filed Under: Borkum Riffgrund, DHSS, Godewind, Installation, installation vessel, International News, Jan de Nul Tagged With: Borkum Riffgrund, DHSS, Jan de Nul, monopile installation, OWF Godewind

All rights reserved - 2025 cookies