Wind Energy – Export Cables Taiwan
Seaway 7 has completed the offshore export cable installation scope for Changfang and Xidao Offshore Wind Farm in Taiwan.
7 export cables have been installed by the Topaz Installer totalling around 210Km in length. Seaway7 continues with the installation of the inner-array cables on the project.