Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Huisman to equip WTIV with 3,000+mt leg encircling crane

Wednesday, April 19 2023

Wind Energy – Leg Encircling Crane

Huisman announced the award of a contract from Havfram Wind for delivery of a 3,000mt+ Leg Encircling Crane for its second NG-20000X Wind Turbine Installation Vessel.

The vessel is ordered at CIMC Raffles. Huisman’s contract follows an earlier order in December 2022 for an identical crane to be installed on the first vessel.

The full electric LEC will be outfitted with a unique 155m boom and has a lifting height of approx. 180m above deck. The design has been finetuned according to specific turbine and foundation installation requirements defined by Havfram’s engineering team.

Related posts:

  1. Huisman to deliver Leg Encircling Crane for Havfram’s new WTIV
  2. Leg encircling cranes for Cadeler x-class vessels
  3. Huisman awarded fourth leg encircling crane from Cosco
  4. Crane for first US WTIV on its way to Texas

Filed Under: Havfram, Huisman, International News, LEC Tagged With: Havfram, Huisman, LEC


Read Magazine Online



Wind and Fossil Info



Event List


  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies