Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Fiberglass pipe for Cadeler’s wind turbine installation vessels

Friday, March 24 2023

General – Fiberglass Pipes

Bondstrand glass-reinforced epoxy piping systems will reduce the total cost of ownership.

NOV has received an order from Cadeler to provide Bondstrand glass-reinforced epoxy (GRE) piping systems for its two X-class wind turbine installation vessels.

NOV’s Fiber Glass Systems plant in Qingdao, China, will manufacture about 1,300 m of Bondstrand 2000M and 2440 series piping systems in diameters ranging from 2 in. to 36 in. The lightweight and corrosion-resistant GRE piping will be used for the ballast, seawater and cooling water, water generator, and leg jetting systems. Deliveries for the first vessel are expected to be completed in March 2023.

Related posts:

  1. Cadeler’s third GustoMSC-designed jack-up vessel largest in industry
  2. NOV to supply Cadeler with replacement crane on Wind Osprey
  3. Cadeler secures preferred supplier agreement
  4. Cadeler signs agreement with Ørsted for Hornsea 3 offshore project

Filed Under: Cadeler, Fiber Glass System, International News, NOV Tagged With: Cadeler, fibreglass, NOV


Read Magazine Online



Wind and Fossil Info



Event List


  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies