Fossil Energy – Norway
Subsea7 recently announced the award of two contracts by Equinor for the Irpa and Verdande field developments, located in the Norwegian Sea.
The two projects will be executed in a consortium between Subsea7 and DeepOcean.
The Irpa field development project, located in the Aasta Hansteen area at 1,350 metres water depth, involves a subsea tieback of approximately 80 kilometres to the Aasta Hansteen FPSO.
The contract scope includes engineering, transportation and installation of a MEG pipeline, a production riser, umbilical, subsea structures and tie-ins.
The Verdande field development project, located in the Nordland Ridge area, involves a subsea tieback to the existing Skuld field and Norne FPSO facilities.
The contract scope includes engineering, transportation and installation of a 7.5-kilometre pipe-in-pipe production pipeline, umbilical, flexibles, subsea structures and tie-ins.