Fossil Energy – Utsira High
Aker BP has awarded TechnipFMC an integrated Engineering, Procurement, Construction, and Installation (iEPCI) contract worth at least $500 million.
The contract is for the development of Aker BP’s Utsira High project.
The contract brings together three projects that will tie back to the Ivar Aasen and Edvard Grieg production platforms. TechnipFMC will engineer, procure, construct, and install the subsea production systems, controls, pipelines, and umblicals for the development.
It follows a two-year integrated front-end engineering and design (iFEED) study to optimize field layout.