Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Allseas secures more T&I work for offshore wind industry

Friday, January 13 2023

Wind Energy – Norfolk Boreas

Allseas has secured additional transport and installation (T&I) work for the offshore wind industry, providing services for Vattenfall’s Norfolk Boreas project off the coast of Norfolk, UK.

Aker Solutions and Siemens Energy will provide grid connection infrastructure for the Norfolk Boreas Offshore Wind Farm. On 15 December, the former awarded Allseas with the T&I contract for the Boreas high voltage direct current (HVDC) converter station.

Located 47 kilometres off the Norfolk coast and with a capacity of 1.4 GW, Norfolk Boreas is the first phase of Vattenfall’s Norfolk Offshore Wind Zone.

Allseas also has T&I options for two similar HVDC platforms for the neighbouring Norfolk Vanguard wind farm, pending an investment decision by Vattenfall.

The Pioneering Spirit  will install the Boreas platform in 2026.

Related posts:

  1. Vattenfall signs grid contract with Siemens Energy and Aker Solutions
  2. Vattenfall signs agreement with LS Cable & System and DEME Group
  3. Allseas wins installation contract for Norwegian production facility
  4. Vattenfall stops development Norfolk Boreas OWF

Filed Under: Allseas, International News, Norfolk Boreas, Pioneering Spirit, Vattenfall Tagged With: Allseas, Norfolk Boreas, T&I, Vattenfall

All rights reserved - 2025 cookies