Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

DEME award Tekmar CPS contract for Dogger Bank C

Friday, December 23 2022

Wind Energy – CPS

Tekmar Group announced that DEME Offshore has awarded the contract to supply Cable Protection Systems (CPS) for the third phase of Dogger Bank C Wind Farm.

Under the scope for the Dogger Bank C phase, Tekmar will design, manufacture and supply a further 172 CPS. This follows the existing contract with EPCI contractor DEME Offshore to supply 380 CPS to protect subsea array cables on Dogger Bank A and B project phases.

The combined contract value across the Dogger Bank Wind Farm represents Tekmar’s largest CPS supply contract to date. Dogger Bank is a 3.6GW offshore wind farm located 130km off the North East coast of England. The project is a joint venture between SSE Renewables, Equinor and Vårgrønn and is set to become the world’s largest offshore wind farm, capable of generating enough renewable energy to power six million UK homes once fully operational.

All systems will be manufactured at Tekmar’s state-of-the-art facility in the North East of England which is located less than 50km from Dogger Bank’s export cable landfall site in Teesside.

Related posts:

  1. Dogger Bank host almost 5000 delegates across 22 supply chain events
  2. Topside Hollandse Kust (north) successfully installed on jacket
  3. CRP Subsea awarded offshore wind contract by Ørsted
  4. Installation of Moray West XXL monopiles

Filed Under: Cable Protection, DEME, Dogger Bank, International News, Tekmar Tagged With: Cable Protection System, DEME Offshore, Dogger Bank, Tekmar

All rights reserved - 2025 cookies