Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

First turbine installed at CHN Energy Bozhong offshore wind project

Tuesday, December 20 2022

Wind Energy – China

The hoisting of the first wind turbine of the CHN Energy Bozhong B2 Offshore Wind Power Project has recently been completed.

The Bozhong B2 project is in the northern sea area of Dongying City, Shandong. The offshore distance of the site center is about 19km, and the water depth is 17-19m.

The project has a planned capacity of 501.5 MW constituted of fifty-nine 8.5 MW wind turbines.

After being put into operation, annual power generation is expected to reach 1,589 GWh.

Related posts:

  1. 3 Gorges starts construction 4GW of offshore project this year
  2. EPCI contract for Orient Cable in China
  3. Double strike success for BladeBUG in latest offshore wind trials
  4. First foundation installation completed at Yangjiang Qingzhou 4 OWF

Filed Under: China, CHN, International News, turbines Tagged With: Bozhong, china, CHN Energy, turbines


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies