Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

56 Jacket piles for Ishikari OWF Japan

Tuesday, December 6 2022

Wind Energy – Japan

Cape Holland just recently announced that from May – August 2022, the CAPE VLT-320 was used for the installation of 56 jacket piles with lengths of 60 meter and a diameter of 2.5 meter for the Ishikari Offshore Wind Farm in Japan.

The piles were driven through a seabed template until trunnions were just above the pile gripper. Pile verticality was critical with constant monitoring whilst driving via the CAPE Holland in-built Inclonometer system.

The ability to extract and re-drive any piles that were out of tolerance was crucial and this key feature of the CAPE VLT-320 was utilized when necessary.

Related posts:

  1. History made by Heerema with offshore testing campaign
  2. World’s largest VLT transported to Rotterdam
  3. CAPE Holland’s VLT completed work at Kaskasi II OWF (VIDEO)
  4. Ballast Nedam completes last foundation on Maasvlakte 2 (VIDEO)

Filed Under: CAPE Holland, International News, Ishikari, Piledriving Tagged With: CAPE Holland, Cape VLT-320, Ishikari, japan


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies