Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

CNOOC announces MDA Gas Field of 3M Project commenced production

Wednesday, November 16 2022

Fossil Energy – Production

CNOOC announced that the MDA Gas Field, the largest gas field of 3M Project in Indonesia, has commenced production.

3M Project is located approximately 75 kilometers southeast of Madura Island in the Madura Strait, East Java, with an average water depth of around 80 meters. The project contains 3 gas fields with a total of 9 gas-producing wells.

The main production facility is a floating production unit (FPU) which will undertake the natural gas production and treatment process. The FPU was constructed in China with a design capacity of 175 million cubic feet per day (MMcf/d).

The MBH Gas Field of 3M Project commenced production in October. Once the 5 gas-producing wells of MDA are put on stream, a peak daily production from 3M Project of approximately 127MMcf/d is expected.

The 3M Project in Indonesia is operated by HCML. As a joint venture partner, CNOOC holds 40% interest in HCML, Cenovus Energy holds 40% interest and Samudra holds 20% interest.

Related posts:

  1. Production at Kenli 6-1 Oilfield 10-1 North Block Development Project
  2. Indonesia offers four oil and gas blocks in second bidding round this year
  3. Indonesia offers first tranche of 2023 acreage
  4. Eni acquires Chevron’s assets in Indonesia

Filed Under: CNOOC, Indonesia, International News, Oil and Gas, Production Tagged With: 3M Project, CNOOC, gas production, Indonesia

All rights reserved - 2025 cookies