Wind Energy – Poland
Vestas announced plans to establish a new assembly factory in Szczecin, Poland, near the Baltic Sea.
The new factory will assemble nacelles and hubs for the V236-15.0 MW™ and will create between 600 and 700 direct jobs.
This factory announcement comes in the wake of Vestas being awarded preferred supplier status with Baltic Power Sp. z o.o, a joint venture between PKN ORLEN S.A. and Northland Power, to supply turbines for the 1.2 GW Baltic Power Offshore Wind Project in Poland.
Vestas will deliver, install, and commission 76 V236-15.0 MW™ wind turbines, and support the foundation designing.