Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Major crane upgrade offshore installation vessel Aeolus

Wednesday, September 28 2022

Wind Energy – Crane Upgrade

Van Oord’s offshore installation vessel Aeolus will get a major crane upgrade.

Aeolus before and after upgrade.

By installing a new, longer boom on Aeolus’ existing crane, the vessel will be ready to handle the newest generation up to 15 MW turbines for offshore wind projects.

Van Oord decided to upgrade the Aeolus to ensure that the vessel remains competitive in a rapidly changing market and, in particular, the increase in turbines sizes.

The new 133m long boom is being designed and built by Huisman. The Aeolus will be fit for duty with the new boom as from early 2023. The vessel will then be capable of installing the new generation 12-15MW turbines while maintaining its lifting capacity of 1,600t for foundation installations.

Related posts:

  1. Van Oord wins first US contract
  2. Installation of near shore export cable Greater Changhua 1 & 2a OWF
  3. Van Oord to install Italy’s first Offshore Wind Farm
  4. Cadeler signs key contract with Van Oord

Filed Under: Aeolus, crane upgrade, installation vessel, International News, Van Oord Tagged With: aeolus, Crane upgrade, Van Oord


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies