Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Rotech Subsea returns to Saint-Nazaire OWF

Thursday, September 22 2022

Wind Energy – Cable De-burial and Rre-burial

Rotech Subsea, wrapped up a four month cable de-burial and re-burial campaign at Saint-Nazaire OWF off France’s Atlantic coast.

Contracted by a global submarine cable system giant, Rotech Subsea’s RS2 CFE equipment spread carried out cable de-burial and re-burial on omega joints and cable ends at the Saint-Nazaire OWF off the Guérande peninsula.

Operating in heavy/dense sands at a depth of 20-30m, Rotech Subsea’s RS2 tool de-buried 650m of cable, including two joint areas and four cut points in a single pass. With backfill occurring quickly at the site repeat passes on the four client specified cut points enabled divers to sling the cable to carry out cutting operations.

Once remedial works had been carried out, the cable was buried to 1.5m-2m DOL in one pass, save for two small remedial sections. With a maximum outlet pressure of 60kPa and a max jet flow of 4000L/s, the heavy/dense soil conditions experience posed no problem for the RS2 the tool progressed at 1 to 2m/min.

Launched using the support vessel crane, forward and aft tugger winches controlled the orientation of the RS2 tool which remained suspended above the seabed/cable as the vessel travelled along the cable route. Trench depth for the de-burial and burial operations was monitored real time using a tool-mounted sonar imager.

Rotech Subsea Director of Subsea, Stephen Cochrane, commented: “It was great to work again with this leading submarine cable player in Saint Nazaire. The RS2 performed as expected in the soil conditions and the rapid backfilling on the trench posed no problems for the 60kPa tool. Its efficient performant led to a saving on total project costs and we look forward to working with the client again in the future.”

“We look forward to working with the client again later in the year on a new award with them in the United States for cable trenching ops off the Eastern Seaboard.”

Related posts:

  1. Jan de Nul installs 80 turbines in French OWF ahead of schedule
  2. Inaugurations in and near the Port of Saint Nazaire
  3. Rotech Subsea completes trio of OWF cable burial operations
  4. France’s first commercial-scale offshore wind farm starts full operations

Filed Under: de-burial and re-burial, International News, Rotech, Saint-Nazaire Tagged With: de-burial and re-burial, Rotech Subsea, Saint Nazaire

All rights reserved - 2025 cookies