Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

First foundation installation completed at Yangjiang Qingzhou 4 OWF

Thursday, September 15 2022

Wind Energy – China

The first pile installation of the Yangjiang Qingzhou 4 Offshore Wind Farm has been completed.

The project is located in the offshore area near Shapa Town, Yangxi County, Yangjiang City, with a total installed capacity of 500MW.

Twenty-five MySE11-23 units, eighteen MySE12-242 units and a 16.6MW floating wind turbine will be deployed.

It is expected that after the project is completed and put into operation at the end of 2023. It will provide about 1.83TWh of clean power every year.

Related posts:

  1. Offshore wind power linked to China’s network surpasses 10m kilowatts
  2. Huadian signs charter for offshore wind vessel under construction in China
  3. World’s largest pile-driving barge
  4. World‘s longest wind turbine blade rolls off assembly line in Lianyungang

Filed Under: China, Installation, International News Tagged With: china, Yangjiang Qingzhou


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies