General – WTIV
Sembcorp Marine has secured a contract for the construction of a Wind Turbine Installation Vessel (WTIV) based on Sembcorp Marine’s in-house design in collaboration with the customer.
The WTIV project is scheduled to be completed in early 2025.
Sembcorp Marine collaborated with its customer intensively over two years providing design development and verification work.
Drawing from the Company’s technological bench strength and world-class offshore engineering competencies, Sembcorp Marine will build a WTIV capable of operating at a high level of efficiency and to handle the next generation of wind turbines which are scaled up in size with longer, lighter rotor blades, taller towers, more reliable drive trains, performance optimising control systems and multi-megawatt power generation.