Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Topsides installed at Greater Changhua

Tuesday, November 9 2021

Wind energy – Taiwan

Ørsted announced that last week two topsides of offshore substations were safely installed in the Taiwanese Greater Changhua 1&2a offshore wind farms.

The campaign only took two days in total.

Related posts:

  1. Keppel O&M completes offshore substations for Ørsted
  2. Construction of Greater Changhua 1 & 2a Offshore Wind Farms in Taiwan
  3. Pacific Hornbill supports construction of Greater Changhua
  4. Installation of near shore export cable Greater Changhua 1 & 2a OWF

Filed Under: Greater Changhua, International News, Orsted, Taiwan, Windenergy Tagged With: Greater Changhua, Orsted, taiwan, topsides


Read Magazine Online



Wind and Fossil Info


Copyright Practica Productions 2014 © All Rights Reserved

Event List


  • Wind Energy Asia 2024
    • 06/03/2024 - 08/03/2024
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies