Ingeteam was selected as the electrical system integrator for the new project of CSBC-DEME Wind Engineering (CDWE) of the very first floating heavy lift and installation vessel named Green Jade to be built in Taiwan for deployment for both the Hai Long and Zhong Neng offshore wind farm projects.
She is set to be delivered in 2022.
Ingeteam will coordinate and assure the design and integration of all electrical systems during the full project, from the early stages of the basic engineering to the detailed electrical engineering, including cabling commissioning and sea trials.