Wind Energy – Saint-Brieuc
Ailes Marines announces today the resumption of construction work on the wind farm in the Bay of Saint-Brieuc.
[Read more…] about Construction work resumes on Saint-Brieuc OWFGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Ailes Marines announces today the resumption of construction work on the wind farm in the Bay of Saint-Brieuc.
[Read more…] about Construction work resumes on Saint-Brieuc OWF
This week the top and bottom parts of the offshore wind farm Saint Brieuc jacket were successfully lifted onto each other at Heerema Fabrication Group’s Vlissingen yard.
[Read more…] about Top and bottom parts Saint Brieuc lifted onto each other
London-based engineering consultancy SLPE announced that its specialist has completed the design scope for the offshore substation for Saint-Brieuc Offshore Wind Farm.
[Read more…] about Certification approval for Saint-Brieuc OWF substation
Ailes Marines announces the end of the pre-trenching campaign for inter-array cables for the Saint-Brieuc offshore wind farm off the coast of France.
[Read more…] about Pre-trenching completed for Saint-Brieuc inter-array cables
Van Oord’s Aeolus has resumed drilling work at the Saint-Brieuc wind farm offshore France after the activities were halted once again last week due to the spillage of hydraulic fluid from one of the drills.
[Read more…] about Drilling resumed again at Saint-Brieuc OWF
Ailes Marines has revealed that Van Oord’s jack-up vessel Aeolus arrived at the Saint-Brieuc offshore wind farm site again on 16 July, after leaving the Port of Rotterdam’s Maasvlakte terminal on 14 July.
[Read more…] about Aeolus returns to Saint-Brieuc