General – testing campaign
Heerema Marine Contractors has tested its novel Rotor Nacelle Assembly (RNA) installation method offshore for the first time.
[Read more…] about History made by Heerema with offshore testing campaignGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Heerema Marine Contractors has tested its novel Rotor Nacelle Assembly (RNA) installation method offshore for the first time.
[Read more…] about History made by Heerema with offshore testing campaign
Recently Heerema’s Sleipnir and its crew were back again at the Tyra Field to install three topsides for TotalEnergies.
[Read more…] about Sleipner installed three Tyra topsides (VIDEO)
TenneT’s Hollandse Kust (Noord) OSS substructure is now entering the final stages of fabrication with the roll up completed and the 2-part cable deck now successfully installed.
[Read more…] about Hollandse Kust (Noord) OSS substructure enters final stages of fabrication
Shimizu Corporation and Heerema Marine Contractors have entered into a cooperation agreement for the Japanese offshore wind market.
[Read more…] about Shimizu and Heerema enter offshore wind partnership
Yesterday morning the Tyra Redevelopment team at Total welcomed home the first new Tyra II topsides in the Danish North Sea.
[Read more…] about First new Tyra II topsides
The world’s biggest crane vessel performing a crane exchange.
[Read more…] about Crane exchange Valhall field center
TAQA has completed the topside removal of the Brae Bravo platform.
[Read more…] about TAQA Group completes topside removal of Brae Bravo
At the end of June Peutz Group Consulting Engineers from the Netherlands conducted underwater noise measurements during pile driving for the installation of the Beta jacket Hollandse Kust Zuid.
[Read more…] about Underwater noise measurements during piling activities
Vestas has secured a firm order for the 257 MW Arcadis Ost 1 offshore wind project from Parkwind, to deliver 27 V174-9.5 MW turbines 19 km north east off the coast of the Island of Rugen, in the German Baltic Sea.
[Read more…] about Vestas introduces new floating installation method for Arcadis Ost 1
Parkwind announced that the 257MW Arcadis Ost 1 offshore wind farm reached financial close.
[Read more…] about Financial close for Arcadis Ost 1