Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Cadeler’s third GustoMSC-designed jack-up vessel largest in industry

Tuesday, June 28 2022

Wind Energy – Cadeler

NOV has been awarded contracts for the equipment and design of Cadeler’s first F-class jack-up vessel.

The new F-class is a bespoke version of the GustoMSC™ NG-20000X model specially designed as a hybrid wind turbine and foundation installation jack-up vessel.

In addition to the first two X-class units, this will be Cadeler’s third GustoMSC-designed jack-up vessel under construction at COSCO Heavy Industries.

The Cadeler F-class is designed on similar specifications as the X-class. These self-propelled jack-up vessels are the largest in the industry, with 5,600 m2 of deck space and a carrying capacity of more than 17,600 tons.

Featuring a larger main crane capacity than the X-class, the F-class vessel’s unique design allows it to quickly convert from a foundation to a wind turbine installation unit.

This new hybrid jack-up vessel is designed to transport and install up to six XL monopiles per round-trip, substantially improving operational efficiency and reducing the installation’s total carbon footprint.

The F-class vessel will have an NOV variable speed drive rack and pinion jacking system. The uniquely integrated system offers high performance, reliability, and safety for thousands of jacking moves throughout the vessel’s lifespan.

The jacking system will include a regenerative power solution where the generated power is fed back into the vessel system, providing fuel savings and emission reductions.

The new F-class vessel is expected to be delivered in Q4 2025.

Related posts:

  1. NOV to supply Cadeler with replacement crane on Wind Osprey
  2. NOV contract to design and equip two offshore wind installation vessels
  3. Installation of first offshore telescopic leg crane  
  4. Cadeler orders installation vessel at Cosco in China

Filed Under: Cadeler, COSCO, GustoMSC, International News, NOV Tagged With: Cadeler, Cosco, GustoMSC, NOV


Read Magazine Online



Wind and Fossil Info



Event List


  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies