Fossil Energy – Johan Sverdrup
On Tuesday 8 March the fifth and final platform was installed at the Johan Sverdrup field by the world’s largest heavy-lift vessel Pioneering Spirit.
Upgrading, life extension and further development of existing infrastructure are some of the most important steps we take to maintain long-term and secure energy deliveries to Europe with good profitability and low production emissions.