Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Second hybrid powered vessel for IWS

Friday, March 4 2022

Wind Energy – Hybrid Powered

The first steel has been cut for Integrated Wind Solutions second Construction Service Operation Vessel at the China Merchants Heavy Industry facility in Jiangsu, China.

The ceremony held 1st of March 2022 marks another major milestone in bringing the series of IWS Fleet’s offshore wind service vessels into the offshore wind market.

The vessel will be named IWS Windwalker, and the steel cutting was conducted 10 days ahead of the initial project plan.

The first vessel of the class, IWS Skywalker, had its steel cutting conducted 14th of January 2022, in accordance with its separate project plan.

The hybrid powered IWS Windwalker is the second vessel in the IWS Fleet’s Skywalker class and is designed specifically to support commissioning works during the construction of wind farms, as well as supporting operations and maintenance during the lifetime of offshore wind farms, bottom fixed and floating.

Related posts:

  1. Dong Fang Offshore purchases Pacific Constructor
  2. Sea trials SOV Groenewind
  3. Contract for Saint-Nazaire offshore wind farm Service Operation Vessel
  4. Ulstein designs Shanghai Electric SOV

Filed Under: International News, IWS, SOV Tagged With: IWS, IWS Windwalker, SOV


Read Magazine Online



Wind and Fossil Info



Event List


  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies