Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Siemens Gamesa rolls out first nacelle for HKZ

Friday, February 18 2022

Wind Energy – HKZ

The first serially-manufactured SG 11.0-200 DD nacelle left the Siemens Gamesa factory hall in Cuxhaven already on Friday, 14 January.

Source: Siemens Gamesa.

The factory has been converted and upgraded for the new product generation over several months since the summer. Now serial production has started and the first turbine has been assembled.

The nacelle will be installed at Vattenfall’s 1.5 GW Hollandse Kust Zuid offshore wind farm in the Netherlands.

A total of 140 turbines from Cuxhaven will be installed at the Hollandse Kust Zuid, making it the largest in the world at the time of commissioning.

The turbines have an output of 11 MW and will be equipped with 97 metres long rotor blades, resulting in a rotor diameter of 200 metres and a swept area of 31,400 square metres.

Related posts:

  1. Siemens Gamesa opens assembly factory in Taiwan
  2. One Borssele turbine out of service due to malfunction and fire
  3. Underwater noise measurements during piling activities
  4. Sustainable future with RecyclableBlade

Filed Under: Cuxhaven, HKZ, International News, nacelle, Siemens Gamesa Tagged With: Cuxhaven, HKZ, nacelle, Siemens Gamesa


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • Suriname, Energy, Oil & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies