Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Oil production kicks off at Buzzard

Monday, November 29 2021

Fossil energy – production

Production has kicked off at a major project designed to extend the life of one of the North Sea’s largest producing fields, Buzzard.

Operator CNOOC has confirmed first oil from the £500million Buzzard Phase 2 development, located around 62 miles north-east of Aberdeen in average water depths of about 96 metres.

The second phase is forecast to reach its peak production of approximately 12,000 barrels of oil equivalent per day (boepd) next year.

It will take Buzzard’s total production to 80,000 boepd in total.

Related posts:

  1. Subsea 7 completes pipeline bundle for Buzzard
  2. Pioneering Spirit swoops in with Buzzard module
  3. CNOOC International hires Valaris ship for exploratory wells
  4. CNOOC announces large oil discovery in Bohai Bay

Filed Under: Buzzard, CNOOC, International News, Oil and Gas Tagged With: Buzzard, CNOOC


Read Magazine Online


Event List

  • WindEnergy Hamburg 2022
    • 27/09/2022 - 30/09/2022
  • Offshore Energy Exhibition & Conference 2022
    • 29/11/2022 - 30/11/2022
    • Amsterdam
  • all events

Follow us on Twitter

Tweets door @OERnews

Copyright © Practica Productions - All rights reserved - 2022 cookies