Fossil energy – removal
A couple of days after single-lift removal of the Morecambe Bay topside from the Irish Sea for Spirit Energy, Pioneering Spirit of Allseas was in East Scotland to transfer the 5450 tonne structure to its cargo barge Iron Lady.

The transfer operation was executed in calm conditions in the sheltered waters of the Firth Estuary, a couple of kilometres off the Edinburgh coastline.
Load-in of the topsides to the CessCon facility at the Fife Energy Park will take place later this month.