Fossil energy – maintenance
Gjøa has performed the longest planned maintenance shutdown in its 10 year history, reported Neptune Energy.
Maintenance work on the installation was performed in addition to preparations for the Duva and Nova project tie-ins that have planned production start-ups in Q3 2021 and 2022, respectively.
Operations resumed on 16 May.