Dubai-headquartered offshore driller Shelf Drilling has secured a ten-year contract extension with Saudi Aramco for the 1983-built jack up rig High Island IX.
The rig will operate in the Arabian Gulf in direct continuation of its current contract.
The High Island IX has been on contract with Saudi Aramco since June 2016. Following this extension, the expected availability of the rig is June 2031.