Vard and Van Oord have chosen Brunvoll as supplier of a complete propulsion and manoeuvring system for what is described as the next generation of cable-laying vessels.
The vessel will be built for Van Oord at VARD Brattvåg, and is expected to be put into operation in 2023.
The vessel is designed by Vard Design in Ålesund and will enter operation for the ever-growing offshore wind power market.