Ocean Energy Resources

SERVING THE OIL, GAS AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues
    • Downloads
  • MEDIA KIT
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • OFFSHORE CAREERS
  • CONTACT

Important contracts in place in Northern Lights project

Thursday, January 28 2021

The energy transition requires new solutions to cut emissions from industry sources in Norway and Europe. With the contract awards to Subsea 7 Norway and Aibel Equinor has taken new and important steps to realise the Northern Lights project.

“The new contracts in the Northern Lights project will create important activity for the supplier industry. Most contracts are now in place, and we look forward to working together with the selected suppliers to realise this pioneering project,” says Peggy Krantz-Underland, Equinor’s chief procurement officer.

Subsea 7 has won an EPCI (engineering, procurement, construction and installation) contract for pipelaying and subsea installations. The contract value is estimated at about NOK 500 million.

The supplier will fabricate and lay a 100 km long pipeline that will transport CO2 from the intermediate storage site at Energiparken in Øygarden to the injection well in the North Sea.

Subsea 7 will also install a 36 km long umbilical that will connect the injection well to the Oseberg field from which the subsea injection facilities will be operated.

Project management and engineering will be delivered by Subsea 7’s office at Forus, while fabrication of pipes will be done at the Vigra spool base near Ålesund. The contract is expected to result in approximately 250 man-years during the project’s life. Planning of the work will start immediately, and the main offshore operations are scheduled to be carried out during 2022-2023.

Oseberg A

Aibel has been awarded an EPCI contract for the Northern Lights subsea control system located on the Oseberg A platform. The contract is awarded as a call-off against the existing Oseberg portfolio agreement signed in July 2020. The estimated value of the assignment is about NOK 140 million.

The scope of work includes all necessary upgrades on the Oseberg A platform to pull in and operate the umbilical system that will connect the platform and the Northern Lights subsea facilities.

Project management and engineering will be performed at Aibel’s offices in Bergen and Stavanger, and prefabrication will take place at the Haugesund yard. The project will contribute with about 60 man-years for Aibel. The work will start in January 2021 and is planned to be completed late 2023.

Related posts:

  1. Contract award for subsea pipelines and marine operations for Johan Sverdrup phase II
  2. Subsea 7 and OneSubsea’s Alliance bagged Bacalhau FEED contract from Equinor
  3. Aibel awarded Oseberg portfolio agreement
  4. Contracts for services at seven supply bases in Norway

Filed Under: Contract, Energy Transition, Innovation, International News, Northern Lights, Norway Tagged With: Aibel, Equinor, Northern Lights Project, subsea 7

Read Magazine Online

Event List

  • Wind Energy Asia 2021
    • 10/03/2021 - 12/03/2021
    • Kaohsiung
  • Offshore Seminar 2021
    • 01/04/2021
    • Rotterdam
  • Offshore Technology Conference 2021
    • 16/08/2021 - 19/08/2021
    • Houston
  • Offshore Europe 2021
    • 07/09/2021 - 10/09/2021
    • Stoneywood
  • SPE Offshore Europe 2021
    • 07/09/2021 - 10/09/2021
    • Aberdeen
  • all events

Follow us on Twitter

Tweets door @OERnews

Copyright © Practica Productions - All rights reserved - 2021 cookies