Ocean Energy Resources

SERVING THE OIL, GAS AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues
    • Downloads
  • MEDIA KIT
  • SUBSCRIBE/ABONNEREN
    • Online OER registratie
  • DIGITAL NEWSLETTER
  • OFFSHORE CAREERS
  • CONTACT

Installation Karish FPSO mooring system

Monday, December 28 2020

On behalf of TechnipFMC, Jumbo Offshore successfully completed the first phase of work on Energean’s Karish gas field offshore Israel.

Scope of work included transport and installation of 14 suction piles (part of a 14-point FPSO mooring system), a tie-in manifold and a 24 inch deep water gas sales spool. The components were installed at a depth of 1,760 metres.

The work is scheduled to recommence in 2021, with the hook-up and installation of the Energean Power FPSO, the first FPSO ever to operate in the East Mediterranean

 

Related posts:

  1. Culzean field on track
  2. InterMoor completes mooring change-out on alba fsu
  3. Maersk Supply Service wins major UK tow and mooring installation project
  4. Aegir completes installation for Qatargas

Filed Under: Installation, International News, Mooring, Oil and Gas Tagged With: Karish FPSO, mooring system

Read Magazine Online

Event List

  • Wind Energy Asia 2021
    • 10/03/2021 - 12/03/2021
    • Kaohsiung
  • Offshore Seminar 2021
    • 01/04/2021
    • Rotterdam
  • WindEurope Copenhagen 2021
    • 27/04/2021 - 29/04/2021
    • Brussels
  • Oil & Gas Asia 2021
    • 08/06/2021 - 10/06/2021
    • Wilayah Persekutuan
  • Offshore Technology Conference 2021
    • 16/08/2021 - 19/08/2021
    • Houston
  • all events

Follow us on Twitter

Tweets door @OERnews

Copyright © Practica Productions - All rights reserved - 2021 cookies