After the successful delivery and sea trials, Fu Yong 6 just completed her very first 220kV power cable loading in Jiangsu, China.
The multi-purpose cable lay barge, owned by S.B. Submarine Systems (SBSS), is now ready for the export cable installation in Guoneng Dafeng offshore wind farm.
Fu Yong 6 is equipped with a 5,500t capacity cable carousel system with high capacity caterpillar track tensioners and a six-point mooring system.
The barge is designed with grounding capability. SBSS will target the shallow water high-voltage export cable installation market, where such services are currently in high demand at the Chinese offshore wind farms.