Cable supplier JDR has agreed a new contract with Subsea 7 to supply a 9.3km production and control umbilical, topside equipment and subsea terminations for the offshore Elgood field in the UK Continental Shelf.
The umbilical will be delivered in Q2 2021 and will connect the Elgood subsea well to the Blythe platform, helping to optimise both production and control with a cost-effective solution.
JDR will manufacture the umbilical, topside terminations, and additional subsea equipment at its state-of-the-art Hartlepool facility, with the hydraulic hoses and LV cables being manufactured in JDR’s Littleport facility.