Keppel O&M has secured two contracts worth a combined value of about S$73 million from MODEC Offshore Production Systems.
In Singapore, Keppel Shipyard has been engaged to fabricate, complete and integrate the topside modules and mooring support structure for a FPSO.
Components for the modules and mooring support structure are scheduled to arrive in 3Q20 for completion as well as integration and installation with the FPSO hull, which is expected in the yard in 4Q20.
Slated for delivery in 2Q21, the FPSO will be equipped to process 90 000 bbl of oil and 75 million ft3/d of gas and with a storage capacity of 700 000 bbl of oil.
In Brazil, Keppel O&M’s BrasFELS shipyard has been awarded a topside module fabrication contract for an FPSO for the Buzios field in the Santos Basin, off the coast of Rio de Janeiro, Brazil.
Work on the FPSO Almirante Barroso MV32 is expected to commence in 3Q20 at the BrasFELS shipyard in Angra dos Reis, with delivery scheduled for 4Q21.
This marks the seventh FPSO related project undertaken by BrasFELS for MODEC. When completed, the vessel will be capable of processing 150 000 bbl of oil and 212 million ft3/d , with a minimum storage capacity of 1.4 million bbl of oil.