Yesterday morning installation vessel Apollo of DEME Offshore departed from a terminal in Port of Oostende with 2 complete wind turbine sets to the SeaMade wind farm at sea.
At the terminal, blades, nacelles and pre-assembled towers are waiting to be installed on the latest wind farm in the Belgian part of the North Sea.
58 8.4 MW wind turbine generators in both concession areas will turn SeaMade into the largest wind farm in the Belgian North Sea.