DEME Offshore’s cable installation vessel ‘Living Stone’ started the installation of the inter-array cables at the SeaMade Offshore Wind Farm in the Belgian North Sea.
The cable load-out at JDR Cable Systems in Hartlepool (UK) was successfully completed.