Last December 2019, Jumbo awarded KENC with multiple engineering assignments.
The scope entailed engineering and FEM calculations to prepare Jumbo’s ‘Fairplayer’ – a DP 2 heavy lift crane vessel (HLCV) – for an FPSO installation job offshore Brazil.
The assignments included engineering of a 192 tonnes gypsy winch grillage and an overboarding tool to handle 120t torpedo piles. FEM calculations were performed on all constructions including the effects on local hull structure. Within four months KENC successfully delivered all calculations and engineering work to full satisfaction of Jumbo.