Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Rusch ME wins contract for Replacement & Refurbishment of 23 overhead cranes

Wednesday, November 15 2017

Today, Wednesday November 15, Rusch Crane Services Middle East LLC (Rusch ME) has been awarded the contract for Replacement & Refurbishment of 23 overhead cranes at DAS Island in Abu Dhabi.

Rusch ME has been set up in September 2016 to achieve a full licensed crane service company that could introduce quality and expertise of Rusch bv from the Netherlands in crane inspection, maintenance and repair into the Middle East. With a local sponsor and the active help of the Dutch Embassy in the UAE Rusch managed to do just that.

Das Island is situated 110 km off the coast of Abu Dhabi and is an important hub for the export of oil and gas. The owner of Das Island’s oil refining operations, Abu Dhabi National Oil Company (ADNOC). Local exporting companies include ADMA-OPCO (Oil), ADGAS (LNG).

The overall contract from ADGAS went to GOGAS/ACMT who in its turn subcontracted all crane related parts to Rusch ME. For Rusch this multi million contract will create 18 months of work.

All cranes are Atex zone 1 classified what makes the job special. The expertise of Rusch ME with the 30 years’ experience back up from the Dutch head office in Medemblik gave Rusch ME the advantage over its competitors.

Edin Mackic, the General Manager of Rusch ME, has set up a quality team of local crane service engineers. All local personal received training in the Netherlands. Together with the engineering back up and the back up of experienced service engineers from the Netherlands, Rusch ME was able to prove to ADGAS that the company is the best partner for this job.

The signing ceremony of the contract between GOGAS/ACMT and Rusch ME took place during the ADIPEC Exhibition in Abu Dhabi in the Rusch stand.

Work will start this month with the first site visit for the detailed engineering and work preparation. It is expected that Rusch will start in the first week of January 2018 with the actual refurbishment.

Signing ceremony: from left to right mr. Ruud Schreijer, CEO Rusch Crane Repair bv, mr. Frank J.M. Mollen, Dutch Ambassador in the UAE and mr. Salim Kumar, B.tech., MBA, Chief Executive Officer of ACMT (Advanced Consulting and Marine Technology LLC).

Related posts:

  1. OOS International orders two new SSCV’s
  2. World’s largest land based crane performs inaugural lifts in Brazil
  3. Gamba export sealine replacement
  4. Sail away giant ‘Wikinger’ substation jacket

Filed Under: Contract, Cranage, International News, Oil and Gas Tagged With: abu dhabi, Adipec, Das ISland, GOGAS/ACMT, Rusch


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • Suriname, Energy, Oil & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies