Long substructures in Stord Saturday, May 27 2017 These 91 meter long substructures are being pictured in Stord, Norway. The structures are floating foundations that will hold the massive wind turbines in place for Hywind Scotland Pilot Park. Related posts: Jan De Nul names ‘Vole au Vent’ DEME laat ‘Living Stone’ te water ABB unveils lightweight, AC Platform-Free HVDC solution BARDOT Group to work with Nexans on Hywind, world’s first floating wind farm