Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

DeepOcean awarded array cable installation for Hornsea project

Wednesday, November 30 2016

DeepOcean announces the award of cable installation and trenching work for DONG Energy’s Hornsea Project One offshore wind farm.

Offshore work will be undertaken in 2018/2019 with DeepOcean’s in-house fleet of dedicated cable installation and trenching vessels. DeepOcean’s scope is the installation and trenching of 93 array cables.

DeepOcean’s Commercial Director for Cables & Trenching Pierre Boyde, said: “After the awards on the Race Bank & Walney Extension projects we are delighted to be further developing our relationship with DONG Energy. We have invested heavily in class leading installation and trenching technology with a strong focus on both safety and productivity. This award will safeguard 150 jobs in Darlington and the surrounding area as well as enabling us to offer significant opportunities to the UK supply chain.”

Duncan Clark, Hornsea Project One Director, DONG Energy said: “Hornsea Project One is an important infrastructure project, which will not only contribute to lower carbon emissions but also play a big role in developing the UK’s offshore wind supply chain. Throughout this project we’ve worked hard to ensure as much value as possible is realised by UK businesses. Today’s announcement further demonstrates both the UK’s ability to supply the offshore wind industry, and DONG Energy’s continuing commitment to investing in the UK.”

When operational, the Hornsea Project One will have a capacity of up to 1.2 gigawatts (GW), providing enough green energy to power well over one million UK homes. The wind farm is being built 120 km east of the Humber Estuary.

dong-energy-and-deepocean-sign-multi-million-pound-contract-safeguarding

l-r-pierre-boyde-and-bart-heijermans-from-deepocean-sign-contract-with-d

Related posts:

  1. DeepOcean awarded offshore export cable installation and trenching contract
  2. Cable installation contract for Walney extension wind farm
  3. Fugro to perform seabed surveys at world’s biggest offshore wind farm
  4. Landfall for VBMS at Surville

Filed Under: Cable laying, Contract, International News, Trenching, Windenergy Tagged With: deepocean, DONG, hornsea


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • Suriname, Energy, Oil & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies